# What does Feldkirchen pay for your solar system?

> Feldkirchen pays up to €4,000 for the PV system and up to €1,000 for battery storage.

Current · read on 28 October 2026 · Sky Solar · https://pv.skysolar.de/en/subsidies/feldkirchen/

## Solar and battery guideline

- **Solar PV:** €200 per kWp up to 10 kWp, €100 per further kWp up to 30 kWp, at most €4,000
- **Battery storage:** €250 per kWh, at most €1,000; backup function required, island-capable backup up to €500 extra
- **Plug-in solar:** €50 per module, at most 4 modules (€200); separate 2026 guideline, apply within 6 months of installing
- **The municipality’s grant page:** https://www.feldkirchen.de/umwelt/foerderprogramme-umwelt/pv-anlagen-batterie
- **Guideline:** valid from 1 Jan 2023, https://www.feldkirchen.de/_Resources/Persistent/2/6/5/d/265d943e5ff646da7bbc7645e1bcaf9ab4700e0a/F%C3%B6rderrichtlinie%20PV-Anlage%20und%20Batteriespeicher.pdf

## How it works in Feldkirchen

You may sign once you have applied.

1. Apply before work starts
2. You may then start at your own risk; 18 months from approval
3. Only on buildings at least 3 years old
4. At most €5,000 in total

Calculator for your own system on the page: https://pv.skysolar.de/en/subsidies/feldkirchen/

## What the neighbours would pay

For 10 kWp with an 8 kWh battery and a wallbox. It is always the municipality where the system is that counts.

| Municipality | Distance | Amount |
|---|---|---|
| Feldkirchen | – | €3,000 |
| Aschheim | 3 km | €3,500 |
| Putzbrunn | 8 km | up to €1,000 |
| Unterföhring | 8 km | €3,000 |
| Neubiberg | 10 km | €1,140 |
| Ismaning | 10 km | up to €1,100 |
| München | 12 km | €0 |

## Frequent questions

### Is there a grant for solar PV in Feldkirchen?

€200 per kWp up to 10 kWp, €100 per further kWp up to 30 kWp, at most €4,000

### Does Feldkirchen fund home batteries (battery storage)?

€250 per kWh, at most €1,000; backup function required, island-capable backup up to €500 extra

### Does Feldkirchen fund plug-in solar?

€50 per module, at most 4 modules (€200); separate 2026 guideline, apply within 6 months of installing

### When do I have to apply?

Before you order. Once the application is in, you may sign.

### What is there besides the municipality?

Everywhere in Germany: the KfW loan 270 for system and battery through your bank, and 0 % VAT on panels, inverters and batteries up to 30 kWp. The Free State of Bavaria pays no grant.

---

No guarantee. The municipality's guideline is what counts, and budgets are limited. Is something out of date? info@skysolar.de

Solar in Munich and around: https://pv.skysolar.de/en/munich/
